Construction site chaos in Schleswig-Holstein: Important closures on June 14th!
Construction site chaos in Schleswig-Holstein: Important closures on June 14th!
in Schleswig-Holstein a lot is happening on the streets. Construction sites and closures shape traffic in the region. In particular, the A1, A7 and A21 motorways are the focus of the construction work, which will not only affect the traffic situation temporarily, but sometimes by the end of 2025. So reports Kn-Online that the total length of the road network in Schleswig-Holstein is impressive 9874.557 kilometers, which means a large scope of work.
How do drivers need to get used to the inside in the coming weeks and months? The A1 is blocked between Pansdorf and Ratekau in the nights until 5 a.m. to carry out necessary repairs to damaged areas. In addition, the route between Neustadt-Pelzerhaken and Lensahn will remain partially lane until June 19, 2025. For the new bridge between Ahrensburg and Bargteheide, it is time -locked from June 13th to 15th and from June 20 to 22, 2025. By the end of 2025, extensive construction work between Eutin and Scharbeutz will also be carried out, which ensure that the traffic is redirected.
Current construction sites on the motorways
The A7 is also affected: Here the section between Hamburg-Stellingen and Hamburg-Heimfeld is closed until June 16, 2025. Drivers have to go along the A21: Adjust the Klein Barkau East junction to Kiel until August 2025. Furthermore, a comprehensive lane renewal will take place between Leezen and Bad Oldesloe-Nord.
Another hotspot of the construction sites is the A23. Here there is a block between Elmshorn and Tornesch until June 19, 2025. The Heide-West ascent and departure will also be fully locked until July 25, 2025. Finally, the B75, B206, B404 and B432 are also affected by construction sites, such as the street portal Verkehrslage.de . It is expected that the construction work on the federal highways will also burden the traffic situation.
traffic situation and the number of accidents in focus
As is well known, challenges for traffic safety are associated with construction sites. According to Kfz.net there was more than 85,000 traffic accidents in 2015, with the number increasing 24.5 % on motorways. The A215 has the highest accident rate in the past ten years, while an improvement in the number of accidents on the A7 has been observed, which is attributed to the extensive construction work and transport orders. It is important that all road users are aware of the risks, especially in construction site areas, where non -adapted speed and other rough traffic violations can often lead to accidents.
The continued construction work and the associated traffic disruptions bring great challenges, whereby all drivers: on the inside are required to show patience and to find out more about the current situation in good time. Whether commuting to work or for traveling on weekends - forward -looking driving and taking into account the current construction sites are essential to get to the goal.
Details | |
---|---|
Ort | Hamburg, Deutschland |
Quellen |
Kommentare (0)